In connection with the construction work in Kroksjølia, we will do our best to minimize inconveniences during the construction period and to ensure the best possible end result.
Development of water and sewage systems in Kroksjølia
The planning process for zoning and development in Kroksjølia has been thorough and comprehensive, with the aim of balancing the need for new recreational plots with consideration for nature, outdoor recreation, and existing buildings. Development of public water and sewage systems has been a central part of the zoning plan.
- Following the announced start in 2016 and broad participation through information meetings and consultation rounds, the plan was adopted in 2018.
- Along the way, several plots have been removed or adjusted to avoid encroachment on wetlands and vulnerable nature, and strict requirements have been set for aesthetics, terrain adaptation, and technical infrastructure.
- Pihl AS holds construction meetings with contractor Maskinkraft every other week during the construction period. The meetings include a standing item focusing on the external environment, where environmental considerations are assessed continuously. The work shall be carried out as gently as possible, and limitations have been imposed on construction width adapted to machinery use to reduce encroachment on the terrain.
By investing in modern water and sewage solutions, Kroksjølia is taking an important step toward a more sustainable and environmentally friendly future. This is not just a technical upgrade – it is an environmental measure that helps preserve the natural values of the area for future generations.


Water and sewage for existing cottages
Due to the ongoing progress, it is recommended that those planning to install water and sewage in their cottage at a later date dig the service lines to the cottage while the development is underway. This will make it easier to coordinate excavation work and renovations, and reduce the inconveniences of the construction work.
By entering into an agreement now, you ensure that the price remains unchanged until your cottage is ready for connection.